End of Day 3
Foundations (mostly) dug for main reinforcing wall and the extended 2nd terrace.
The 2nd terrace will be 10m long to allow for the summerhouse to sit on this.
It's now 8m longer than on the architect's plan.
The 2nd terrace will be 10m long to allow for the summerhouse to sit on this.
It's now 8m longer than on the architect's plan.